Nama Ruas Jalan | 190 - PADON - MINGGIR |
No. Jembatan | KB.34.0004.0190.001 |
Nama Jembatan | DOGATEN II |
Kapanewon | Minggir |
kmpost | |
Koordinat | -7.725496, 110.258336 |
# | 2021 | 2022 | 2023 |
---|---|---|---|
Dimensi |
|||
Panjang | 5.3 m | 5.3 m | 5.3 m |
Lebar | 7.95 m | 7.95 m | 7.95 m |
Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
Tipe | Plat | Plat | Plat |
Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
Kondisi | 2 | 2 | 2 |
Lantai |
|||
Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
Bahan 2 | Aspal | Aspal | Aspal |
Kondisi | 2 | 2 | 1 |
Sandaran |
|||
Bahan 1 | Pasangan bata | Pasangan bata | Pasangan bata |
Bahan 2 | |||
Kondisi | 1 | 1 | 1 |
Kepala Jembatan / Pilar |
|||
Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
Kondisi | 2 | 3 | 1 |
Pondasi |
|||
Tipe | Langsung | Langsung | Langsung |
Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
Kondisi | 1 | 1 | 2 |
KONDISI |
|||
Nilai Kondisi | 3 (Rusak Berat) | 3 (Rusak Berat) | 3 (Rusak Berat) |
Kerusakan | Sayap jembatan retak dan penurunan mutu abutment pasangan bata,Lapis permukaan aspal retak dan cat mengelupas | Penurunan mutu/retak pada bangunan kepala jembatan dan sayap jembatan,Penurunan mutu/tulangan berkarat pada bangunan plat jembatan | Penurunan nilai mutu dan terdapat kerusakan pada bagian plat,Aspal aus dan retak pada sistem lantai |
Penanganan | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi (perbaikan dan /atau perkuatan) | Rehabilitasi |