- Tanggal : 04-Jul-2025 | Pukul : 20:40 , Selamat Malam
Nama Ruas Jalan | 193 - GAMPING - BANTULAN |
No. Jembatan | KB.34.0004.0193.001 |
Nama Jembatan | MEJING KIDUL |
Kapanewon | Gamping |
kmpost | |
Koordinat | -7.790881, 110.322880 |
# | 2021 | 2022 | 2023 |
---|---|---|---|
Dimensi |
|||
Panjang | 5.7 m | 5.7 m | 5.7 m |
Lebar | 8.6 m | 8.6 m | 8.6 m |
Bentang | 1 | 1 | 1 |
Struktur Bangunan Atas |
|||
Tipe | Plat | Plat | Plat |
Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
Kondisi | 2 | 2 | 2 |
Lantai |
|||
Bahan 1 | Beton bertulang | Beton bertulang | Beton bertulang |
Bahan 2 | Aspal | Aspal | Aspal |
Kondisi | 2 | 2 | 1 |
Sandaran |
|||
Bahan 1 | Pasangan batu | Pasangan batu | Pasangan batu |
Bahan 2 | |||
Kondisi | 1 | 3 | 2 |
Kepala Jembatan / Pilar |
|||
Tipe | Dinding penuh | Dinding penuh | Dinding penuh |
Bahan | Beton bertulang | Beton bertulang | Beton bertulang |
Kondisi | 2 | 2 | 1 |
Pondasi |
|||
Tipe | Langsung | Langsung | Langsung |
Bahan | Pasangan batu | Pasangan batu | Pasangan batu |
Kondisi | 1 | 1 | 2 |
KONDISI |
|||
Nilai Kondisi | 2 (Rusak Sedang) | 3 (Rusak Berat) | 2 (Rusak Sedang) |
Kerusakan | Penurunan mutu pasangan bata pada abutment ,Coretan cat dan cat mengelupas | Penurunan mutu/retak pada bangunan kepala jembatan,Penurunan mutu/aus/lapuk pada bangunan plat jembatan | Retak pada selimut beton bagian pelat,Aspal aus dan retak pada sistem lantai |
Penanganan | Pemeliharaan Berkala | Rehabilitasi (perbaikan dan /atau perkuatan) | Pemeliharaan Berkala |